Aug 21, 2021 · During the design optimization of the excavator boom, there are many design variables and complicated processes. The original optimization methods mainly focused on the optimization of mathematical models, and they lacked consideration in the use of domain knowledge, design-specification knowledge, expert experience knowledge, and historical examples. In order to …
Get a quoteMar 01, 2021 · In general, the executing structure of the excavator is the typical planar linkage mechanism and its driving mechanism is hydraulic cylinder. If the lengths of executing structures such as boom, stick, link, rocket and bucket are fixed, the working condition is defined by the lengths of the driving hydraulic cylinders, i.e. boom cylinder, stick cylinder and bucket cylinder.
Get a quoteBUCKET STRUCTURE MUST BE STUDIED WELL SO THAT THE LIFE OF BUCKET CAN BE IMPROVED.EXCAVATOR BUCKET IS DESIGNED FOR the work regarding the optimization of bucket to give maximum fatigue life for the digging at the desired force conditions. Backhoe mechanism of excavator bucket is explained well as the crack developed on them during high
Get a quoteExcavator Arm shows stress is coming under allowable limit. Design Iterations are carried out to get the optimized weight of the structure by keeping the stresses within the allowable limit.
Get a quoteFinite element analysis of excavator mechanical behavior
Get a quoteexcavator arm are productivity and fuel consumption. As the present mechanism used in excavator arm is subjected to torsional and bending stresses during lifting and digging operation respectively, because of which failure occurs frequently at the bucket end of the arm. So, the new mechanism of excavator arm is …
Get a quoteFor excavator design, if the bucket section is intended to be versatile and can incorporate multiple tool sets (bucket, hammer, and so on), then the rest of the excavator structure should be designed to operate under a variety of different boundary conditions.
Get a quoteThe present paper is review of various analysis done on components of excavator arm and there are various forces affects on components that affect productivity and fuel consumption. Excavators are intended for excavating rocks and soils. It consists of four link members: the bucket, the stick, the boom and the revolving super structure (upper carriage). The excavator mechanism must work
Get a quoteFig. 1 Bucket shape optimization 5.1. Bucket capacity calculations- Bucket capacity is a measure of the maximum volume of the material that can be accommodated inside the bucket of the backhoe excavator. Bucket capacity can be either measured in struck capacity or heaped capacity. Globally
Get a quoteThe stress analysis and structure optimization of such key components platforms, swing arms, bucket rods and lower chassis has fully guaranteed the reliability of the structural members. The daily maintenance is sufficiently convenient and you only need to open the rear hood for maintenance of the engine oil, fuel and air filters. 1.
Get a quoteDesign And Analysis Of An Excavator - IJERT
Get a quote3) V-Bucket: The V bucket is a special excavator bucket. It has a V shaped structure that helps it penetrate easily through the soil. The angled sides make it easier to dig. This saves costs on power while digging. Work that involves laying pipes is ideally suited to this type of excavator bucket. 4) Skeleton Bucket: A skeleton bucket is a modified digging bucket. It accomplishes an additional task while digging.
Get a quoteDesign and Shape Optimization of Excavator Bucket
Get a quoteAbstract: According to the "Major National Science And Technology Infrastructure" 13th Five-Year "National Strategic Deployment Plan",the national basic engineering and strategic engineering construction has entered a new climax.As important engineerinng machine,the performance of the excavator has an important influence on improving the engineering efficiency.The JH180 excavator is …
Get a quoteIn view of the phenomenon that the excavator bucket is damaged before it reaches the theoretical life in the actual normal digging process. Based on the continuous trajectory theory, the three-segment continuous trajectory excavated alternately by bucket and rod is selected as the normal digging trajectory. The theoretical digging force (TDF) and limiting digging force (LDF) on the normal
Get a quoteThe Excavators made up of four connecting members named as the bucket, the stick, the boom and the base structure rotating or revolving super structure (upper carriage). Due to some certain working conditions, the excavator parts are subjected to working under high load conditions. The excavator's mechanism must
Get a quoteJan 23, 2014 · In order to solve the problem that hydraulic excavator in the real working process cannot meet the design requirements and reveals insufficient digging force, a new method on mechanism optimal design of backhoe hydraulic excavator working device based on digging paths is introduced and discussed in this paper. Considering the characteristics of consecutive digging process of hydraulic
Get a quoteDesign and Shape Optimization of Excavator Bucket
Get a quoteoptimizes the structure of excavator bucket mechanism by using ADAMS [4] [11]. II. THE DESIGN REQUIREMENT OF BUCKET MECHANISM Backhoe bucket mechanism generally uses six link mechanism. In order to meet the requirements of excavation, unloading and transportation, the bucket's rotational angle is in 150°to 180°[5].When the bucket
Get a quotecylinder rod mechanism which is used to drive the transmission system. 4. Excavating system: It contains a bucket and bucket linkage which is connected to the front arm by hydraulic cylinder rod mechanism and is used to lift the material. The Hydraulic Excavator is most commonly used for digging rocks and soil, but with its many
Get a quote